The Best Practice Test Preparation for the 1Z0-1075-21 Certification Exam [Q24-Q44]

Rate this post

The Best Practice Test Preparation for the 1Z0-1075-21 Certification Exam

1Z0-1075-21 Exam Dumps, Practice Test Questions BUNDLE PACK

NEW QUESTION 24
Which two steps should you use to create a new Oracle Transactional Business Intelligence report in the ManufacturingCloud?

 
 
 
 

NEW QUESTION 25
During a Manufacturing Cloud implementation, the customer request to develop Oracle Transactional Business Intelligence reports that are not available out-of- the box.
Identify the tool that is available to the Report Developer in Manufacturing Cloud to develop the reports.

 
 
 
 

NEW QUESTION 26
Identify the three sources from which supply chain orchestration (SCO) can create the work orders.

 
 
 
 
 

NEW QUESTION 27
Work order costs are computed based on material and resource transactions reported and the cost method of the product. In a manufacturing plant, the production operator has completed a work order WO-001 ensuring proper materials and resource transactions. The materials are costed and resources are defined with rates.
A cost accountant has created cost accounting distributions. Upon reviewing the accounting distributions of the work order WO-001, resources charged to the work order are missing.
Identify the Concurrent Request that needs to be submitted to transfer resource charges to cost accounting.

 
 
 
 

NEW QUESTION 28
The Manufacturing Engineer, responsible for creating and maintaining the Work Definitions, hasscheduled the Process Item Structure Changes to Work Definitions program. However, after the execution of the program the engineer did not receive a notification with the details of the Item Structure changes.
Which two reasons could cause this?

 
 
 
 
 

NEW QUESTION 29
In a manufacturing plant, two purchase components P1 and P2 and a resource R1 are required to assemble a product. The cost of the assembly is calculated by using the standard costing method. The work definition and resource rates of the assembly have been defined as required.
A cost accountant is estimating cost of the assembly, analyzing rolled-up costs before finally publishing estimates as frozen standards to cost accounting by using a cost planning scenario. While reviewing rolled up costs, the extended costs of purchase components are not included in a rolled-up scenario.
Identify the reason.

 
 
 
 

NEW QUESTION 30
A production Supervisor has noticed that Work Orders created manually are overwritten by the plan runs executed by Planning Central. After discussing this issue with the Planner, two actions are recommended to prevent the Work Orders from being overwritten by plan runs.
Identify the two recommendations.

 
 
 
 

NEW QUESTION 31
A production operator needs to review the materials issued, resources charged, and operations performed for a job that was executed inthe previous shift.
Identify the task the operator has to select to review all the transactions in a single place for both Work Order and Orderless execution.

 
 
 
 

NEW QUESTION 32
A manufacturing cloud user wants to print information available in the work order in PDF.
Identify the three reports that the user can print directly from the work order screen using the Print PDF action.

 
 
 
 
 

NEW QUESTION 33
Your customer has defined the work definitions. They have created and saved a new version for the work definition and want to edit that work definition.
Which two attributes cannot be updated using the Edit Work Definition Details action?

 
 
 
 

NEW QUESTION 34
Your customer plans to use Oracle Representational State Transfer (REST) API with Oracle Supply Chain Management Cloud (Oracle SCM Cloud) to support integration requirements.
Identify four REST resources and thecorresponding HTTP action available with Manufacturing Cloud.

 
 
 
 
 
 

NEW QUESTION 35
In what three ways can you set the overcompletion tolerance for a subcomponent yield, so the job order can report the excess production completion?

 
 
 
 
 

NEW QUESTION 36
To reduce the subassembly stock with no impact on material planning of child components of the subassemblies stock, you need to modify the multilevel item structure of a product.
Identify the action that meets this requirement.

 
 
 
 

NEW QUESTION 37
You arereviewing the production status of your manufacturing plant shop floor as a production supervisor.
Your production manager wants a report on a work order status which is reserved against a particular customer. The final assembly of the work order is serialized.
Which option shows the steps to complete the task using the mobile application?

 
 
 
 

NEW QUESTION 38
Identify two conditions that should be met at the same time for a Standard Operation to be called an Optional Operation.

 
 
 
 
 

NEW QUESTION 39
A user wants to transfer the work order status updates and resource transaction data for costed resources to Cost Management.
Whichscheduled process should you run to achieve this requirement?

 
 
 
 

NEW QUESTION 40
Identify thetwo capabilities that the Application Development Framework Desktop Integration (ADFDI) framework provides for Work Definitions in Manufacturing Cloud.

 
 
 
 

NEW QUESTION 41
The production user wants to report Work Order completion.
Identify two ways of reporting the progress of work order at work order operation level.

 
 
 
 
 

NEW QUESTION 42
Your customer has multiple distribution centers and a few manufacturing plants. Plants make different items with some overlap between them in terms of productsmanufactured. The distribution centers stock parts from all plants. A Corporate Engineering team is responsible for centrally defining items and catalogues. This team defines the items and sets the attributes for most parameters. The respective distribution centers and manufacturing plants are allowed to change some attributes locally.
Identify two different ways of achieving this requirement.

 
 
 
 
 

NEW QUESTION 43
You can generate and manage work order exceptions in Oracle Manufacturing Cloud. Which users can report production exception andwho gets notified after an exception is raised?

 
 
 
 

NEW QUESTION 44
Identify the two configurations in Supply Chain cloud applications of Product Information Management (PIM) and Order promising (GOP), which must be set to process the Back-to-Back order with Make Supply Order, for a nonstocked item.

 
 
 
 
 

Oracle 1Z0-1075-21 Exam Syllabus Topics:

Topic Details
Topic 1
  • Create manufacturing Production Exceptions, including raising exceptions and managing and resolving exceptions
  • (New) Set up common Configuration Elements
Topic 2
  • Set up and implement Cost Planning estimates
  • Describe and Compute Production Costs
  • Explain Work Execution Work Areas
Topic 3
  • Describe Managerial Accounting Basics & Cost Accounting
  • Explain Work Order Reservations and History
Topic 4
  • Describe Production Execution transactions (including Outside Processing)
  • Describe Functional Set Up Manager and Simplified Setup
Topic 5
  • Explain Common Inventory Configurations
  • Describe Import Production Transactions
  • Describe Manufacturing Lead-time
Topic 6
  • Evaluate a Work Order completion cost, including Partial and Scrap
  • Explain Production Transaction Review and Product Genealogy
Topic 7
  • Execute Basic Transaction and Work Order Reporting
  • Explain Common Projects Enabled SCM Configurations
Topic 8
  • Reporting and Analytics for Manufacturing
  • Describe Manufacturing Cloud integrations
Topic 9
  • Describe Manufacturing Supervisor Mobile Applications
  • Transfer Production Transactions to Costing
Topic 10
  • Explain Cost Reporting, including WIP Inventory Valuation Report
  • Configure Resources, Operations, and Work Centers

 

Prepare for the Actual Manufacturing Cloud 1Z0-1075-21 Exam Practice Materials Collection: https://www.dumpleader.com/1Z0-1075-21_exam.html

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below