NO.17 A client asks that a lighting system be designed using the initial lamp lumen output.
Which of the following effects would this request have on the standard light design?

 
 
 
 

NO.18

Refer to the exhibit (concrete rigid frame building with aluminum curtain wall system).
The drawing shows a proposed concrete rigid frame building enclosed in an aluminum curtain wall system.
To save money, the contractor proposed to eliminate the curtain wall system and substitute steel stud framing, which is anchored between the columns and beams and covered with a stucco finish.
What is the most likely result of this substitution?

 
 
 
 

NO.19 In the design of a project, the architect should do which of the following in order to respond to the requirements imposed by governmental authorities that have jurisdiction over the project?

 
 
 
 

NO.20 Comprehensive recycling of materials from building demolition is primarily limited by which one of the following?

 
 
 
 

NO.21 For a government-owned project, architects can reduce consumption and waste by including which of the following requirements in their design and specifications? Check the four that apply.

 
 
 
 
 
 

NO.22 The zoning approval process may involve obtaining which of the following? Check the four that apply.

 
 
 
 
 
 

NO.23 Click on the area of the concrete beam elevation where steel reinforcing will most improve the beam’s span capability.

NO.24 An elementary school requires a renovation, selective demolition, and a major addition in order to accommodate a growing student population. An architectural firm has prepared schematic design plans incorporating the school’s increased programmatic needs, including an enlarged library, cafeteria, and gymnasium; a secure courtyard; and additional space for administrative offices and classrooms. The main entrance was relocated in order to improve the traffic and pedestrian flow at the beginning and end of the school day, and additional parking was provided to comply with current zoning requirements.
The existing single-story masonry building was built in 1950. Two small additions were built later: the north addition will be kept and repurposed, but the south addition will be demolished. The building contains asbestos and lead in roof soffits, floor tiles, pipe insulation, and window paint. All existing mechanical systems need to be replaced; new systems have not been selected.
Considerations for the renovation include:
* The relocated front entrance must be easily recognizable, highly visible, and secure.
* Interior and exterior materials need to be durable and maintainable in order to withstand frequent student abuse, but also economical due to strict budget limitations.
* Good indoor air quality and increased energy efficiency are priorities for the selection of mechanical equipment.
After completion, the entire school should look uniform, without a distinctive difference between the existing building and new addition.
Building information:
* Construction Type is II-B.
The following resources are available for your reference:
* Existing Plans, including site and floor plans
* Proposed Plans, including site and floor plans
* Cost Analysis
* Zoning Ordinance Excerpts, for off-street parking requirements
* IBC Excerpts, showing relevant code sections
* ADA Standards Excerpts, showing relevant sections from the ADA Standards for Accessible Design When the addition is completed, the school will be fully sprinkled per NFPA 13 Standard for the Installation of Sprinkler Systems requirements, with a continuous 24-foot wide fire access lane provided around the building perimeter.
Through a code analysis, the combination of construction type, occupancy, and building area present a compliance problem.

 
 
 

NO.25 A new four-story apartment building is being designed on a site that has solid bedrock subsurface conditions.
The client requested the lowest cost of installation, highest energy efficiency, the shortest round trip time, and minimized loss of usable building space.
Which elevator type should the architect recommend?

 
 
 
 

NO.26 Structural costs for wind resistance increase exponentially as building height is increased, primarily due to which of the following factors? Check the two that apply.

 
 
 
 
 
 

NO.27 A multistory warehouse is to be converted into a high-tech office building. The owners propose a variety of services and flexibility to tenants, including cable/internet, fiber optic communications, dish/satellite, and security systems.
In order to accommodate this broad array of electronic and communications services, the architect should recommend which of the following electrical and communications distribution systems?

 
 
 
 

NO.28 An architect has just received client approval of the Schematic Design documents for a three-story, outpatient medical clinic. The clinic is located within a mixed-use development governed by a City-approved Planned Development (PD) document. The medical clinic design utilizes standardized departmental layouts and includes outpatient clinics, as well as treatment spaces, administrative spaces and public/lobby spaces.
The site needs to accommodate four different vehicular traffic flows: patient traffic, staff traffic, service and delivery traffic, and emergency services traffic. In addition, a pedestrian plaza must connect to the mixed-use development sidewalks. The plaza must provide space for bicycle parking and will serve as the future bus stop.
The site design addresses several challenges related to building orientation. The southeast facade, with excellent visibility from the highway, is the location of all service equipment. The building entrance faces northwest, convenient to the parking but not visible from the highway.
The client believes future patient volumes will outgrow the clinic. The PD document allows for a planned Phase 2 development on the adjacent vacant site to the southwest. Phase 2 would include a second building (2 story, 80,000 BGSF) and/or a parking deck.
Other considerations for the project include:
* Protected tree requirements are defined in the PD document.
* Easy pedestrian access must be provided from Sycamore Boulevard.
* All required parking for the clinic must be accommodated on site.
* Programmed area includes 109,450 Departmental Gross Square Feet (DGSF) / 130,184 Building Gross Square Feet (BGSF).
* Exterior material percentages are dictated by the PD document and shall not exceed specific percentages for Primary and Secondary Finishes.
* All service equipment needs to be screened; see PD document for restrictions.
* Signage opportunities are important to the client.
* Acoustical privacy is a concern of the healthcare system.
The following resources are available for your reference:
* Drawings, including a perspective, plans, and exterior elevations
* Building Program, including client’s departmental program and detailed program for Treatment 01 (Infusion)
* Exterior Material Cost Comparisons
* Planned Development Document
* IBC Excerpts, showing relevant code sections
* ADA Excerpts, showing relevant sections from the ADA Standards for Accessible Design Refer to the exhibit.
What is the required wall finish for rooms 1201 through 1206 on the first floor?

 
 
 

NO.29 The use of a central computer system to monitor a building’s heating and cooling demands will do which one of the following?

 
 
 
 

NO.30 A one-story residence in a dry climate with cold winter nights is designed with an unconditioned dirt floor crawlspace utilizing underfloor plumbing and HVAC ductwork. The owner is interested in using a concrete slab-on-grade floor instead of the pier-and-beam concrete floor over an open crawlspace as originally designed.
What are the impacts of changing the design to a slab-on-grade floor system? Check the two that apply.

 
 
 
 
 
 

NO.31 Which of the following are characteristics of heavy-timber construction? Check the four that apply.

 
 
 
 
 
 

NO.32 An architect has just received client approval of the Schematic Design documents for a three-story, outpatient medical clinic. The clinic is located within a mixed-use development governed by a City-approved Planned Development (PD) document. The medical clinic design utilizes standardized departmental layouts and includes outpatient clinics, as well as treatment spaces, administrative spaces and public/lobby spaces.
The site needs to accommodate four different vehicular traffic flows: patient traffic, staff traffic, service and delivery traffic, and emergency services traffic. In addition, a pedestrian plaza must connect to the mixed-use development sidewalks. The plaza must provide space for bicycle parking and will serve as the future bus stop.
The site design addresses several challenges related to building orientation. The southeast facade, with excellent visibility from the highway, is the location of all service equipment. The building entrance faces northwest, convenient to the parking but not visible from the highway.
The client believes future patient volumes will outgrow the clinic. The PD document allows for a planned Phase 2 development on the adjacent vacant site to the southwest. Phase 2 would include a second building (2 story, 80,000 BGSF) and/or a parking deck.
Other considerations for the project include:
* Protected tree requirements are defined in the PD document.
* Easy pedestrian access must be provided from Sycamore Boulevard.
* All required parking for the clinic must be accommodated on site.
* Programmed area includes 109,450 Departmental Gross Square Feet (DGSF) / 130,184 Building Gross Square Feet (BGSF).
* Exterior material percentages are dictated by the PD document and shall not exceed specific percentages for Primary and Secondary Finishes.
* All service equipment needs to be screened; see PD document for restrictions.
* Signage opportunities are important to the client.
* Acoustical privacy is a concern of the healthcare system.
The following resources are available for your reference:
* Drawings, including a perspective, plans, and exterior elevations
* Building Program, including client’s departmental program and detailed program for Treatment 01 (Infusion)
* Exterior Material Cost Comparisons
* Planned Development Document
* IBC Excerpts, showing relevant code sections
* ADA Excerpts, showing relevant sections from the ADA Standards for Accessible Design The owner is considering fitting out part of the shell space on the third floor as a cafeteria with tables and chairs and a 1,000-square-foot kitchen. The architect notes that the aggregate occupant load is 325 for the spaces already planned for the third floor and the proposed kitchen.
What is the net area that can be allocated to the cafeteria before a third exit stair is needed from the third floor?

 
 
 

NO.33 An architect has just received client approval of the Schematic Design documents for a three-story, outpatient medical clinic. The clinic is located within a mixed-use development governed by a City-approved Planned Development (PD) document. The medical clinic design utilizes standardized departmental layouts and includes outpatient clinics, as well as treatment spaces, administrative spaces and public/lobby spaces.
The site needs to accommodate four different vehicular traffic flows: patient traffic, staff traffic, service and delivery traffic, and emergency services traffic. In addition, a pedestrian plaza must connect to the mixed-use development sidewalks. The plaza must provide space for bicycle parking and will serve as the future bus stop.
The site design addresses several challenges related to building orientation. The southeast facade, with excellent visibility from the highway, is the location of all service equipment. The building entrance faces northwest, convenient to the parking but not visible from the highway.
The client believes future patient volumes will outgrow the clinic. The PD document allows for a planned Phase 2 development on the adjacent vacant site to the southwest. Phase 2 would include a second building (2 story, 80,000 BGSF) and/or a parking deck.
Other considerations for the project include:
* Protected tree requirements are defined in the PD document.
* Easy pedestrian access must be provided from Sycamore Boulevard.
* All required parking for the clinic must be accommodated on site.
* Programmed area includes 109,450 Departmental Gross Square Feet (DGSF) / 130,184 Building Gross Square Feet (BGSF).
* Exterior material percentages are dictated by the PD document and shall not exceed specific percentages for Primary and Secondary Finishes.
* All service equipment needs to be screened; see PD document for restrictions.
* Signage opportunities are important to the client.
* Acoustical privacy is a concern of the healthcare system.
The following resources are available for your reference:
* Drawings, including a perspective, plans, and exterior elevations
* Building Program, including client’s departmental program and detailed program for Treatment 01 (Infusion)
* Exterior Material Cost Comparisons
* Planned Development Document
* IBC Excerpts, showing relevant code sections
* ADA Excerpts, showing relevant sections from the ADA Standards for Accessible Design


Which of the following design strategies would best address the vehicular circulation, visibility, and future expansion challenges for this project? Select the best answer.

 
 
 
 

NO.34 An elementary school requires a renovation, selective demolition, and a major addition in order to accommodate a growing student population. An architectural firm has prepared schematic design plans incorporating the school’s increased programmatic needs, including an enlarged library, cafeteria, and gymnasium; a secure courtyard; and additional space for administrative offices and classrooms. The main entrance was relocated in order to improve the traffic and pedestrian flow at the beginning and end of the school day, and additional parking was provided to comply with current zoning requirements.
The existing single-story masonry building was built in 1950. Two small additions were built later: the north addition will be kept and repurposed, but the south addition will be demolished. The building contains asbestos and lead in roof soffits, floor tiles, pipe insulation, and window paint. All existing mechanical systems need to be replaced; new systems have not been selected.
Considerations for the renovation include:
* The relocated front entrance must be easily recognizable, highly visible, and secure.
* Interior and exterior materials need to be durable and maintainable in order to withstand frequent student abuse, but also economical due to strict budget limitations.
* Good indoor air quality and increased energy efficiency are priorities for the selection of mechanical equipment.
After completion, the entire school should look uniform, without a distinctive difference between the existing building and new addition.
Building information:
* Construction Type is II-B.
The following resources are available for your reference:
* Existing Plans, including site and floor plans
* Proposed Plans, including site and floor plans
* Cost Analysis
* Zoning Ordinance Excerpts, for off-street parking requirements
* IBC Excerpts, showing relevant code sections
* ADA Standards Excerpts, showing relevant sections from the ADA Standards for Accessible Design

 
 
 
 

NO.35 An architect is commissioned to design a lodge in a location where the water service is insufficient for a sprinkler system. The architect plans to maximize sight lines by using exposed columns and roof structure in the primary assembly space.
Which of the following systems meet these requirements? Check the three that apply.

 
 
 
 
 
 

NCARB Project-Planning-Design Exam Syllabus Topics:

Topic Details
Topic 1
  • Building Systems, Materials, & Assemblies: This section of the exam measures skills of architectural designers and covers the understanding of building systems such as mechanical, electrical, and plumbing, along with structural and specialty systems. It also involves selecting appropriate materials and assemblies to align with program needs, budgets, and regulations.
Topic 2
  • Environmental Conditions & Context: This section of the exam measures skills of architectural designers and covers how to use site analysis information to determine building placement and environmental planning decisions. It emphasizes applying sustainable principles and considering the neighborhood context to guide project design.
Topic 3
  • Project Integration of Program & Systems: This section of the exam measures skills of project architects and focuses on integrating decisions about environmental conditions, codes, and building systems into one cohesive project design. It highlights how to configure the building and incorporate both program requirements and contextual conditions in a unified design approach.
Topic 4
  • Codes & Regulations: This section of the exam measures the skills of project architects and focuses on applying zoning laws, environmental rules, and building codes during the planning stage. Candidates are tested on how to integrate multiple regulatory requirements into a project’s design effectively.
Topic 5
  • Project Costs & Budgeting: This section of the exam measures skills of architectural designers and assesses the ability to evaluate design alternatives based on program goals, perform cost evaluations, and manage cost considerations throughout the design process.

 

Updated Project-Planning-Design Exam Practice Test Questions: https://www.dumpleader.com/Project-Planning-Design_exam.html

         

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below