Prepare Civil-Engineering-Technology Question Answers Free Update With 100% Exam Passing Guarantee [Q67-Q84]

4/5 - (1 vote)

Prepare Civil-Engineering-Technology Question Answers Free Update With 100% Exam Passing Guarantee [2026]

Dumps Real CTTAM Civil-Engineering-Technology Exam Questions [Updated 2026]

CTTAM Civil-Engineering-Technology Exam Syllabus Topics:

Section Weight Objectives
Municipal Engineering 20% – Water supply and distribution

  • 1. Water quality and treatment basics
  • 2. Water system design and hydraulics

– Wastewater and stormwater management

  • 1. Drainage and flood control
  • 2. Sanitary and storm sewer design
Materials Testing 20% – Soil mechanics and testing

  • 1. Compaction and bearing capacity tests
  • 2. Soil classification and properties

– Concrete and asphalt testing

  • 1. Field and laboratory testing procedures
  • 2. Mix design and quality control
Structural Design Fundamentals 20% – Design of structural elements

  • 1. Steel and timber design basics
  • 2. Reinforced concrete design

– Structural analysis

  • 1. Analysis of beams, columns, and frames
  • 2. Load determination and load paths
Transportation Engineering 20% – Highway and road design

  • 1. Pavement design and materials
  • 2. Geometric design principles

– Traffic engineering

  • 1. Traffic flow and capacity analysis
  • 2. Signal design and traffic control
Surveying 20% – Measurement and calculation techniques

  • 1. Computation and adjustment of survey data
  • 2. Field measurement procedures

– Surveying equipment and methods

  • 1. GPS and modern surveying technologies
  • 2. Total station and leveling instrument operation

 

Q67. What substance is used to calibrate a concrete air pressure meter?

 
 
 
 

Q68. Considering Occupational Health and Safety standards for trench side slopes in lieu of shoring, and a 1.2 m wide trench, what is the minimum offset from centre line to the top edge of the trench for an excavation that is
3 m deep?

 
 
 
 

Q69. What is the most important information a civil engineering technologist should be familiar with before stepping onsite during site inspection?

 
 
 
 

Q70. What documents must a contractor submit as part of a project to consultants for review?

 
 
 
 

Q71. A civil engineering technologist is undertaking a final acceptance review of a subdivision. The technologist finds 35 m of deficient sidewalk and three hydrants which were not tested. As part of final acceptance, what should be done to ensure the hydrants get tested and the sidewalk is repaired?

 
 
 
 

Q72. The critical path refers to which of the following series of tasks in a schedule?

 
 
 
 

Q73. Prior to entering an active construction site, what must all visitors do?

 
 
 
 

Q74. A continuous beam is supported in the middle and at both ends. It has a uniform load applied to the top. What will be the reactive forces at the supports?

 
 
 
 

Q75. A subcontractor is completing surface rehabilitation in a mature community. What are the minimum requirements for quality that must be met?

 
 
 
 

Q76. A civil engineering technologist works for a contractor. An engineer notifies him that the depth of concrete pilings needs to be increased. What is the first thing the civil engineering technologist should do?

 
 
 
 

Q77. Why would an owner require COR certification from a contractor?

 
 
 
 

Q78. A cologist is required to inspect the installation of a sanitary service pipe to confirm the slope. The technologist measures an elevation of 705.667 at the end of the service and 705.202 at the main. The horizontal measurement from the main to the end of the service is 22.10 m. What is the slope of the pipe?

 
 
 
 

Q79. For granular material, what is the typical optimum moisture content for dry densities ranging from 2100 kg/m³ to 2200 kg/m³?

 
 
 
 

Q80. A concrete mix is onsite and at its specified slump of 80 mm. The pour requires a slump of 200 mm. The concrete onsite meets all other requirements. What action should be taken?

 
 
 
 

Q81. Which of the following tests are required as part of soil grain size analysis?

 
 
 
 

Q82. A civil engineering technologist is to inspect control joint saw-cuts on a newly poured concrete slab. What saw cut depth would be typically specified?

 
 
 
 

Q83. Which of the following correctly indicates the information that must be provided on a site plan?

 
 
 
 

Q84. What two municipal plans are required to define a new civil infrastructure project?

 
 
 
 

Civil-Engineering-Technology Exam Dumps, Civil-Engineering-Technology Practice Test Questions: https://www.dumpleader.com/Civil-Engineering-Technology_exam.html

         

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below