NO.58 A single component water borne acrylic coating cures by:

 
 
 
 

NO.59 All of these are advantages of using repair patches EXCEPT

 
 
 
 

NO.60 Ideally, documentation requirements should be defined:

 
 
 
 

NO.61 Individuals conducting Coating Surveys should:

 
 
 
 

NO.62 The Concrete Repair Institute’s comparators can be used to assess:

 
 
 
 

NO.63 You are NACE Level 2 Inspector working on a tank lining job where a mobile centrifugal blast unit is being used to blast the tank floor to a NACE No.1/SSPC SP 5. The Contractor has completed his final blast and has called for a hold point inspection. This is the 1 st time you have seen field based centrifugal blast cleaning. You observe what appears to be staining on the substrate however the Contractor assures you this is normal when using centrifugal blast units and what you are seeing is what is defined in the standard as an acceptable variation in appearance.
Your FIRST preferred course of action is to:

 
 
 
 

NO.64 Which product, when closely inspected has a green or red layer of fusion bonded epoxy (FBE) that is visible directly on the steel?

 
 
 
 

NO.65 In powder coatings, when the particles of powder begin to flow but are not fully liquid, they are in what stage?

 
 
 
 

NO.66 You are the new NACE Level 2 Inspector on a job which had been very problematic. The previous Inspector was fired duo to personality conflicts with the Contractor’s supervisor. Upon arriving onsite the Contractor’s supervisor advises you in no uncertain terms that you will be the next to go, unless you cooperate with him.
Your FIRST preferred course of action is to:

 
 
 
 

NO.67 Centrifugal blast cleaning requires:

 
 
 
 

NO.68 Which standards are generally established by private-sector bodies and are available for use by any person or Organization, private or government?

 
 
 
 

NO.69 When performing inspection in accordance with ASTM D 4138 the Inspector will use:

 
 
 
 

NO.70 Generally for safety considerations, waterjetting hose connections use

 
 
 
 

NO.71 NACE/SSPC Water Jetting standards are directly equivalent to ISO Abrasive Blast Standards:

 
 

NO.72 You are the NACY Coating Inspector on a tank lining project where desiccant dehumidification is being used. Since the first shift of abrasive blasting your readings have indicated relative humidity below 40%; however on the second shift of coating application your readings are indicting 80%.
Your FIRST preferred course of action is to:

 
 
 
 

NO.73 When ASIN D 3363 is specified the Inspector must:

 
 
 
 

NO.74 The coating applicator has ignored a enface preparation hold point and applied coating over the surface without a sign off from you as the inspector.
Your FIRST preferred course of action is to:

 
 
 
 

NO.75 In the event of a conflict between the Product Data Sheet and the Specification:

 
 
 
 

NO.76 Galvanizing performs best in which of the following exposures:

 
 
 
 

NO.77 Which product, is used in conjunction with other coatings such as FBE when the lines run through wetlands or a body of water?

 
 
 
 

NO.78 The cost of qualified Coating Inspection is normally offset by:

 
 
 
 

NO.79 You have just your NACE CIP Level 2 certification when you are asked to supervise a team of uncertified field pipeline inspectors.
Your FIRST preferred course of action is to:

 
 
 
 

NO.80 When performing testing in accordance with ASTM D 2583 the inspector may observe:

 
 
 
 

NACE-CIP2-001 dumps – Dumpleader – 100% Passing Guarantee: https://www.dumpleader.com/NACE-CIP2-001_exam.html

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below